Andorra la Vella and Canillo eliminates the transfer of 15%
The capital expected to reduce to 0% the transfer of land in urban area
The two phases of the National Stadium would cost five million
Andorra is situated between the three first countries in the world in download speed
Andorra will collaborate in the drafting of the business plan of the airport of la Seu d'urgell
The president of Fomento del trabajo sees the opening as an opportunity
The contractors of works to bless the measures of shock to revive the sector
Reactivate the construction
The entity will hold a shareholders ' meeting on may 18.